2012 U.A.E.
V 500 Double 21 m
2012 Germany
One more job site was finished successfully.
For easy assembling and disassembling the vibroflot have 3 plug systems. The photo shows the disassembling of the vibroflot in the middle.
Crawler crane Liebherr 1550, boom length 86 m.
71 m deep compaction, working radius 30 m.
Implementation time one year.
Vibroflot V 500, follow tubes 406 mm.
2011 U.A.E. Extension of a Harbor
V 500
2009 USA
V 330
2008 U.A.E. Sand Compaction for Hotels
2008 USA
V 330
2006 Dubai
V 500
In the moment 6 Vibroflots V 500 are at work in Dubai. The photo shows an 11 years old machine – still working with a space of 5.6 m to 6.0 m.
The follow tubes have a second tube inside, called double system. It’s not necessary to weld additional tubes at the outside of the follow tubes. The plug system between the follow tubes and the vibro helps to change a vibro in 2 hours in hanging position.
The machines are running “full time” (24 hours per day, 7 days per week…). The life capacity between two inside repairs is about 1500 to 2200 hours.
2004 Germany
V 500
Refilled coalmine
Two hidden dams, depth 56 m
Working radius 45 m
Compaction 2000 to 4000 m³/h
Two cranes 550 tons, mast 86 m
Two new Vibroflot V 500, 212 kW
Plug System 406 mm
Follow up tubes with 2 internal canals
No welded tubes outside
24 Jets at the lower end
Compaction depth 56 m
Working radius 45 m
No point pins, adjusting by computer and GPS +- 2 cm
Control panel with frequency
transformer and computer control for:
- Running direction
- Ampere-Time curve for starting
- Maximum working Ampere
- Speed
Lifting up in steps or continue, controlled by time or Ampere or both